I just noticed an update:
Accounting Pass (date: 20/11/2006)
Warehouse Pass (date: 22/11/2006)
Assembly -
Quality Control -
Shipping -
Tracking# -
The 'Warehouse' bit is (I assume) when they have got all the bits and pieces to build my system.
The excitement is building.
This will be a new era for a Blitz product. In fact, I have made a note to make Blitz3D the first thing I install. I believe my new system will run Blitz3D faster than anything else previously.
It will be a new dawn of Blitz3D - all those, shadow, particle, water, physics systems all running with massive amounts of geometry and stuff - without even breaking into a sweat.
EDIT:
Ordered from CyberPower - just to increase the fact it will show up in a search engine
Accounting Pass (date: 20/11/2006)
Warehouse Pass (date: 22/11/2006)
Assembly -
Quality Control -
Shipping -
Tracking# -
The 'Warehouse' bit is (I assume) when they have got all the bits and pieces to build my system.
The excitement is building.
This will be a new era for a Blitz product. In fact, I have made a note to make Blitz3D the first thing I install. I believe my new system will run Blitz3D faster than anything else previously.
It will be a new dawn of Blitz3D - all those, shadow, particle, water, physics systems all running with massive amounts of geometry and stuff - without even breaking into a sweat.
EDIT:
Ordered from CyberPower - just to increase the fact it will show up in a search engine